Project Details
ASTC undertook site investigation works, including soil sampling and testing prior to the ground being broken. ASTC also provided drawings and technical specifications relating to the drainage, rootzone and turfgrass for the construction of the new Ormiston College sports fields. ASTC also provided quality control checks during construction, which commenced in September 2020) and the turf consolidation period.
ASTC also conducted sports field auditing across the College’s existing sports fields and provided a turf maintenance plan and BOQ which the school can use later as a Request for Quote, where the documentation can be sent to prospective turf maintenance companies for tender.
- Location: 97 Dundas St W, Ormiston QLD 4160
- Timeframe: Feb 2020 to current
Services
Designs and specifications for:
- Subsoil drainage
- Growing medium
- Sports field construction
- Turfgrass
- Establishment and maintenance
During construction and consolidation:
- Quality control checks
- Sports field audit prior to handover
- Analytical testing
Auditing and maintenance:
- Sports field auditing of the schools existing sports fields
- Soil nutritional testing
- Preparation of an annual sports turf maintenance plan