Project Details
Australian Sports Turf Consultants (ASTC) have been engaged by Brisbane City Council (BCC) to conduct site investigative works in August 2021 to prepare technical sports turf specifications for the redevelopment of Sunnybank Rugby Union‘s (SRU) Field 3.
The existing surface is a mixture of green couch and kikuyu grass.
- Location: D.M. Henderson Park, 470 McCullough St, Sunnybank QLD 4109
- Timeframe: 22 December 2021 to 11 April 2022
- Appointed Contractor: Twin View Turf
* The above video captures some classic images of the old Field 1 and breaking of ground for the old Sunnybank clubhouse.
Services
Site investigation work:
- Site inspection to determine required works and restraints
- Soil sampling to determine site and soil conditions
- Soil nutritional testing
- Site surveying to determine existing levels and prepare designs, including cut and fill requirements
Designs and/or specifications for:
- Sports field development work
- Topsoil (soil blend) importation and soil amendments
- Turfgrass selection
- Establishment and maintenance over the 8 week consolidation period
During construction and consolidation:
- Quality control checks
- Analytical testing
- Sports field audit prior to handover of the field to Council