Search
Close this search box.

News

Bribie Island Soccer Field Redevelopment

MBRC have engaged ASTC to undertake a pre-works site investigation and soil testing to then provide technical specifications in the redevelopment of Soccer Field 1 within the Bribie Island Soccer Club. Quality Control inspections will also be undertaken during the redevelopment to assist Council.

Read More »

Soil Testing in the Isaac Region

ASTC have been engaged by Isaac Regional Council to visit the region and collect soil samples from their sports fields for nutritional testing. Isaac Council has requested independent testing and recommendations to maintain and improve their sporting facilities.

Read More »

Speaker’s Green Redevelopment

Queensland Parliamentary Service engaged ASTC to assess the Speaker’s Green within Queensland’s Parliament House and provide recommendations and technical specifications for its redevelopment.

Read More »

Nudgee Recreation Reserve

Brisbane City Council (BCC) engaged ASTC to provide specialist soil and sports turf services for the design of the 9-hectare sports fields to be constructed at Nudgee.

Read More »

Sports Field Topdressing Trial

ASTC organised a sand blend topdressing trial to be setup within South East Queensland. The trial, endorsed by Brisbane City Council, was established to compare 4 sand topdressing blends to be able to demonstrate product differences to Council and sporting clubs.

Read More »

Ryan Tracey joins ASTC

ASTC would like to welcome Ryan Tracey to the Team. Ryan is a qualified superintendent and comes to ASTC with over 12 years’ experience in

Read More »

QSAC Bermudagrass Trial

Queensland Sports and Athletics Centre (QSAC) engaged ASTC to manage a comparative 12 month study on assessing different types of couches (bermudagrasses). The project was designed to help QSAC management choose a suitable grass for turf replacement of their Main Field in 2022.

Read More »

South Pine Sports Complex Soccer 2

ASTC were engaged by Moreton Bay Regional Council to undertake a pre-works site investigation, survey works, to prepare detailed specifications and BOQ for tender use, and quality control checks during the construction and consolidation period.

Read More »